Second simulation and demonstration workshop - June 2013

During the la week of May 2013, the whole consortium meet in order to perform the second simulation campaign of the project.

All the available modules were integrated and connected to the main simulation infrastructure. The simulation network, as well as the various functional modules were tested and several simulation runs were performed.

On June 25th, 2013 was held the second demonstration workshop, aiming at demonstrating to an external audience the simulation results, as well as the first findings of the project. The detailed agenda of this event and the presentations given are available hereunder (click on the presentation name).

.

.

Project description and concept key elements

Project general presentation - Onera

  • Context
  • Partners
  • Objectives

4D contract concept overview - Onera

  • General concept
  • Bubbles
  • Strategies

"Story of a 4D contract" - Onera

General presentation of the demonstration - DLR

.

Demonstration

Traffic sample used for the simulations - NLR

  • Traffic generation
  • Arrival / Departure optimization
  • Scenarios

.

GLOBAL TRAFFIC SIMULATION

Strategic planning

Simulation infrastructure description - DLR

Contract compliance monitoring - University of Patras

SIMULATION RUN: Contract compliance monitoring

Tactical re-planning - Technion

SIMULATION RUN - test case 1: nominal traffic situation

SIMULATION RUN - test case 2: saturated traffic situation

SIMULATION RUN - test case 3: airport closure

Emergency situation management - NLR

  • Onboard self-generation of safe 4D contract

SIMULATION RUN - test case 4: rapid descent due to depressurization

Ground movement planning - Monitor Soft

SIMULATION RUN - ground movement

.

INDIVIDUAL AIRCRAFT SIMULATION

Aircraft guidance and control: 4D contract automatic execution - CIRA/TsAGI

SIMULATION RUN: 4D contract execution at the aircraft level

Trajectory "greening" - IAI/Alenia

SIMULATION RUN: Trajectory optimization within a 4D contract

Data link architecture and capabilities - Thales

SIMULATION RUN: Data link

.

Conclusion and discussion

Project achievements and first findings - Onera

  • Achievements: aircraft GC, 4D contracts, simulation
  • First findings: aircraft GC, 4D contracts
  • Link with SESAR
  • Achievements vs project objectives

Audience feedback and open discussion

.